kura

INT-03 · Installation · 21 Sep 2026

Studio du Parc de la Cité Internationale des Arts et du Bien-Être, Pilates Rive Gauche, Niveau -2

L'Atelier Pilates & Co « Premium » & Fils · site page

Progress

In progress
25/36 steps

2 machines completed out of 3

Technician
Siobhán O'Brien (O'Brien & Ça Frères Ltd)
Started / closed
21 Sep 2026 21:12

Instructions for the technician

Goods lift unavailable, plan for 2 people.

Report

The report is produced when the intervention is closed, then sent to the client active contacts, to the site report emails and to the administrators.

Technician note

No note yet. It is written at closing, on the phone.

Machines and steps

  1. Megaformer A ATE-M-0001 · 12/12 steps Done
  2. Megaformer B ATE-M-0002 · 12/12 steps Done
  3. Megaformer n°3 ATE-M-0003 · 1/12 steps In progress

Megaformer

Megaformer B

Hide the checkpoint details Machine page
  1. 1. Identify the machine [to be replaced by the client checklist]

    Done

    1 OK · 0 N/A · 0 to do · 0 Not OK out of 1 checkpoints

    • OK Checkpoint 1 of "Identify the machine" [to be replaced by the client checklist]
    Photo of the serial plate

    21 Sep 2026 21:12

  2. 2. Unpacking and parcel check [to be replaced by the client checklist]

    Done

    2 OK · 0 N/A · 0 to do · 0 Not OK out of 2 checkpoints

    • OK Checkpoint 1 of "Unpacking and parcel check" [to be replaced by the client checklist]
    • OK Checkpoint 2 of "Unpacking and parcel check" [to be replaced by the client checklist]
    Parcel before opening

    21 Sep 2026 21:23

  3. 3. Check of the parts received [to be replaced by the client checklist]

    Done

    2 OK · 0 N/A · 0 to do · 0 Not OK out of 2 checkpoints

    • OK Checkpoint 1 of "Check of the parts received" [to be replaced by the client checklist]
    • OK Checkpoint 2 of "Check of the parts received" [to be replaced by the client checklist]
  4. 4. Frame assembly [to be replaced by the client checklist]

    Done

    2 OK · 0 N/A · 0 to do · 0 Not OK out of 2 checkpoints

    • OK Checkpoint 1 of "Frame assembly" [to be replaced by the client checklist]
    • OK Checkpoint 2 of "Frame assembly" [to be replaced by the client checklist]
  5. 5. Carriage and rails assembly [to be replaced by the client checklist]

    Done

    2 OK · 0 N/A · 0 to do · 0 Not OK out of 2 checkpoints

    • OK Checkpoint 1 of "Carriage and rails assembly" [to be replaced by the client checklist]
    • OK Checkpoint 2 of "Carriage and rails assembly" [to be replaced by the client checklist]
    Carriage assembled

    21 Sep 2026 21:56

  6. 6. Fitting the springs [to be replaced by the client checklist]

    Done

    2 OK · 0 N/A · 0 to do · 0 Not OK out of 2 checkpoints

    • OK Checkpoint 1 of "Fitting the springs" [to be replaced by the client checklist]
    • OK Checkpoint 2 of "Fitting the springs" [to be replaced by the client checklist]
  7. 7. Strap adjustment [to be replaced by the client checklist]

    Done

    1 OK · 0 N/A · 0 to do · 0 Not OK out of 1 checkpoints

    • OK Checkpoint 1 of "Strap adjustment" [to be replaced by the client checklist]
  8. 8. Footbar and shoulder rests [to be replaced by the client checklist]

    Done

    0 OK · 0 N/A · 0 to do · 1 Not OK out of 1 checkpoints

    • Not OK Checkpoint 1 of "Footbar and shoulder rests" [to be replaced by the client checklist]

      Comment: Right shoulder rest scratched on delivery, photo attached.

  9. 9. Levelling on the floor [to be replaced by the client checklist]

    Done

    1 OK · 0 N/A · 0 to do · 0 Not OK out of 1 checkpoints

    • OK Checkpoint 1 of "Levelling on the floor" [to be replaced by the client checklist]
  10. 10. Function test [to be replaced by the client checklist]

    Done

    1 OK · 0 N/A · 0 to do · 0 Not OK out of 1 checkpoints

    • OK Checkpoint 1 of "Function test" [to be replaced by the client checklist]
  11. 11. Cleaning and removal of packaging [to be replaced by the client checklist]

    Done
  12. 12. Sticking the QR label and handover [to be replaced by the client checklist]

    Done
    QR label stuck on the frame

    21 Sep 2026 23:13

Field answers cannot be changed from the office: the proof comes from the technician. A mistake is fixed by cancelling the intervention and creating it again.